Construction Systems inc
medusaThis record tracks a ransomware attack claimed by the medusa group against Construction Systems inc. It collects the publicly disclosed attack details — sector, location and timeline — as published on the operator's leak site and indexed by Breach House.
Window Zero
EXPOSURE GAPWindow Zero is the time the breach stayed in the open before anyone said so — the gap between when the attack was first discovered on the operator's leak site (t1) and when it was publicly disclosed (t2). The wider this window, the longer victims, staff and customers were exposed with no warning.
Attack Summary
Construction Systems inc. provides complete commercial renovation and specialties installation services for medical, commercial office, industrial, retail, education and etc. Construction Systems corporate office is located in 2865 E 14th Ave, Columbus, Ohio, 43219, United States and has 105 employees.The total amount of data leakage is 80.80 GB
Leak Screenshots
SAMPLEProof-of-breach screenshots the operator posted from the stolen data. Previews are redacted and locked — the originals are available on HaveIBeenRansom.